JABODETABEK URBAN TRANSPORTATION POLICY INTEGRATION - PHASE 2    



MAPS

Integrated Future Transportation Network Map
Integrated Future Transportation Network Map Road Base
Integrated Future Transportation Network Map Rail Base

INTEGRATED FUTURE TRANSPORTATION NETWORK MAP

Existing | Short Term (2019) | Mid Term (2024) | Long Term (2029)


Intergrated Long Term
Intergrated Long Term Rail Base




Maps | Guidelines | Technical Report


© 2017 - JUTPI 2
Jabodetabek Urban Transportation Policy Integration - Phase 2
Setiabudi 2 Building 5th Floor, Suite 502
Jl. H.R. Rasuna Said Kav. 62, Jakarta 12920